Inspection Management

RFI Generator

Dynamic Request for Inspection preparation with ITP-driven fields, Tag + Activity validation, prerequisite control, barcode traceability, document references, inspection disposition and simulated IMM updating.

Module Presentation

Select Module Function

Choose only one function for the current session. The module can be used either to submit an inspection request to QC or to prepare/process a formal RFI.

Requester mode: prepare and submit an inspection request to QC. Formal RFI controls are hidden.
Requester / Inspection Request

Inspection Request to QC

Complete the fields from left to right and top to bottom. ITP-controlled information is populated automatically.

Default: request date + 1 day
Inspection time will be coordinated by QC.
Select the activity and equipment tag(s), then validate Tag + Activity readiness before submission.
QC Request Screening

Requester Items – QC Screening & Comments

When the Requester submits an inspection request to QC, all requested Tag + Activity items are automatically populated in this QC Screening table under Make / Process RFI. Activity No. and Activity Description are shown for each item. QC can review each item and add comments where required. Any ready item with no QC comment is automatically cleared to proceed to formal RFI. Items with QC comments or failed readiness/prerequisite validation are returned/held and isolated from formal RFI generation.

SelectNo.Equipment TagItem DecisionActivity No. Activity DescriptionRequester Status / Validation Requester RemarksCommon QC CommentQC RemarksQC Screening StatusAction Required
Requester Tag + Activity items will automatically populate here for QC screening.
Formal RFI · Sheet 1 Data

Project & RFI Information

17 · Tag Validation

Tag Validation / Readiness Gate

0Selected Tags
0Eligible
0Blocked
0Accepted
Select an activity and equipment tag(s), then run validation.
18 · Equipment Tags

Equipment Tag Selection

19 · Status

Tag + Activity Status

Equipment TagActivityIMM / RFI StatusEligibilityReason
No validation performed.
20 · Register

Equipment Tag & Barcode Register

No.Equipment TagActivity No.BarcodeSystemSubsystemLocationIMM StatusTag Disposition
Validate eligible tags to populate Sheet 2.
21–24 · References

Reference Standards, Procedures, Drawings & Additional Documents

Select an activity to load applicable drawings/documents and revisions.
24 · Additional Reference Documents
No.TypeDocument No.TitleRev.Status
No reference document added.
25 · Disposition & Signatory

Requester Disposition & Signatories

This section is for the requesting work department before submission to QC. It is separate from the formal QC/Client RFI disposition and signatories.

RoleNameSignature / InitialDate
Email Notification

Inspection Request Email Notification

Prepare the notification to QC after the work department completes the inspection request.

Inspection Result

Disposition & Signatories

RoleNameSignature / InitialDate
Contractor Construction
Contractor QC Inspector
Contractor QC Supervisor / Lead
PMT / PMC Inspector
PID / Client / Company Inspector
Formal RFI Notification

RFI Email Notification & Recipient Register