Quality Assurance Management Dashboard
Integrated QA control for inspection trends, proactive notifications, focused assessments, NCRs, audits, corrective actions, calibration, risks and lessons learned.
Proactive Alerts & Trends
Assurance & Improvement Controls
NCR Management
Raise, classify, investigate, correct, verify effectiveness and close NCRs.
Proactive Quality Notification
Notify stakeholders before recurring observations escalate to formal nonconformance.
Focused Assessment
Target repeated or high-risk concerns by area, system, discipline, equipment or activity.
Quality Audit Management
Plan audits, record findings, assign actions and track closure.
Test Instrument Control
Calibration status, expiry alerts, instrument assignment and traceability.
Best Practices
Capture verified good practices and approved benchmark installations.
Lessons Learned
Convert recurring findings and successful corrective actions into reusable lessons.
Risk & Trend Analysis
Analyze return rate, repeated reasons, NCR recurrence, aging and quality risk.
Repeated Issues / Violations
Track recurring nonconformities, repeated QC returns, violations, repeated observations and ineffective corrective actions.
NCR Management
Control confirmed non-conformances / violations from NCR generation through corrective action, effectiveness verification, closure, recurrence review and trend analysis.
| NCR Management Function | Purpose |
|---|---|
| NCR Generator | Create, save, edit, view and print formal NCR records. |
| NCR Register | Maintain current and historical NCR status and traceability. |
| Open / Overdue NCR Monitoring | Identify NCRs requiring immediate follow-up or escalation. |
| Corrective Action Tracking | Track correction, root cause, corrective action, responsible party and target date. |
| Effectiveness Verification & Closure | Verify objective evidence before final NCR closure. |
| Repeated Non-Conformance / Violation | Detect recurrence and reassess previous root cause and corrective-action effectiveness. |
| NCR Trend & Recurrence Analysis | Analyze recurring NCRs by discipline, area, system, activity, requirement and responsible team. |
Non-Conformance Report (NCR) Generator
Create, review, view and print controlled NCR records. The NCR can be linked to RFI, IMM, ITP, drawings, specifications, equipment tags and quality concerns.
NCR Register
| NCR No. | Date | Area | Tag(s) | Description | Priority | Owner | Due | Status | Actions |
|---|
NCR Email Routing, Review & Approval
The NCR is routed sequentially. It starts with the QC Inspector, proceeds through the configured QC approval workflow, and is released to the corrective-action department only after the final required QC approval.
| Stage | From | To | Purpose | Status | Action |
|---|---|---|---|---|---|
| 1 | QC Inspector | QC Supervisor | Submit NCR for review and approval | Draft / Pending Submission | |
| 2 | QC Supervisor | QC Manager | Forward approved NCR for management approval | Locked — Awaiting Stage 1 Approval | |
| 3 | QC Manager | Corrective Action Department | Issue approved NCR for response and corrective action | Locked — Awaiting Final QC Approval |
Recipient Corrective Action & Initial Root Cause Response
The designated NCR recipient / responsible department may provide the initial root cause, correction and proposed corrective action. The final root cause is subject to QC review, verification and acceptance.
QC Review & Final Root Cause
QC reviews the recipient's initial root cause and proposed corrective action. The final root cause is completed and controlled by QC after review of the response and objective evidence.
Proactive Quality Notification (PQN) Management
Manage preventive quality notifications for potential violations or quality concerns requiring action before they become actual non-conformances / violations.
| PQN Management Function | Purpose |
|---|---|
| PQN Generator | Create, save, edit, view and print formal Proactive Quality Notifications. |
| PQN Register | Maintain issued, open, under-monitoring, effective and escalated PQNs. |
| Preventive Action Tracking | Track action required to prevent the potential concern from becoming an actual violation. |
| Monitoring & Follow-Up | Monitor recurrence or development of the potential issue during the defined review period. |
| PQN Effectiveness Verification | Verify whether preventive action successfully avoided an actual non-conformance / violation. |
| PQN → NCR Escalation | Link to NCR Management only when an actual non-conformance / violation subsequently occurs. |
| PQN Trend Analysis | Analyze preventive notifications by discipline, area, activity, category, risk and responsible team. |
Proactive Quality Notification (PQN) Generator
Generate a formal proactive notification for emerging, repeated or high-risk quality concerns before escalation to a formal NCR. Each PQN remains traceable to subsequent observations and NCRs for effectiveness measurement.
Proactive Quality Notification Register
| PQN No. | Date | Area | Concern | Risk | Owner | Due | Before / After | Effectiveness | Status | Actions |
|---|
Focused Assessment
Perform a controlled assessment of selected samples from a process, activity, system, equipment group, work area or location. One Focused Assessment contains one dedicated sample/findings table. Every Negative finding requires a corresponding NCR.
| Focused Assessment Function | Purpose |
|---|---|
| Focused Assessment Generator | Create a specific assessment with scope, objective, sampling basis and sampled findings. |
| Focused Assessment Register | Maintain one register row per assessment and recall the complete assessment record. |
| Findings & Evidence | Record each sampled item against relevant standard/code and project specification requirements. |
| NCR Linkage | Every Negative finding requires a corresponding NCR and transfers the finding to NCR Management. |
| Follow-up / Effectiveness | Track linked NCR status and corrective-action verification. |
| Closure | Close the assessment after the required assessment and linked-action controls are satisfied. |
Focused Assessment Generator
Sample / Findings Table
| Sample / Tag / Item | Location | Standard / Code & Clause | Project Specification & Paragraph | Assessment Criteria | Finding / Observation | Result | Evidence | NCR No. | NCR Status | Action |
|---|
Focused Assessment Register
| FA No. | Focused Assessment Title | Discipline | Process / Activity | Area / Location | Date | Samples | Positive | Negative | NCRs | Status | Actions |
|---|
NCR Management · Repeated Non-Conformance / Violation Analysis
Use this NCR Management function when the same or substantially similar actual non-conformance / violation occurs again after a previous NCR and corrective action. This is separate from PQN, which is preventive and is used before an actual violation/nonconformance occurs.
Repeated Non-Conformance Register
| Repeated NC | Current NCR | Previous NCR(s) | Area | Non-Conformance | Recurrences | Previous Effectiveness | Owner | Status | Actions |
|---|
Repeated Issues / Violations Register
Consolidates repeated QC returns, surveillance observations, NCRs, audit findings, client observations and violations so recurring conditions can be escalated before they continue across areas, systems or equipment.
| Issue No. | Type | Area | Tag / Activity | Issue / Violation | Occurrences | Severity | Owner | QA Action | Status |
|---|---|---|---|---|---|---|---|---|---|
| RI-2026-001 | Repeated Site Observation | PDM 216/221 | Cable Tray / 3.1 | Repeated missing / insufficient cable tray supports | 3 | High | Construction | Focused Assessment | Open |
Quality Concern Register
| Concern No. | Source | Area | Tag / Activity | Concern | Priority | Owner | Due | Status | Action |
|---|---|---|---|---|---|---|---|---|---|
| QC-2026-001 | Site Surveillance | PDM 216/221 | Cable Tray / 3.1 | Repeated missing/insufficient supports | High | Construction | 18-Sep-2026 | Open | |
| QC-2026-002 | Material / PMI | Offshore | Banding Strap | Material verification / corrosion concern | High | Material | 20-Sep-2026 | Action |
Action & Effectiveness Tracker
| Ref. | Action | Owner | Due | Effectiveness | Status |
|---|---|---|---|---|---|
| NCR-0532 | Compile and submit missing documents | Document / QC | Open | Pending verification | In Progress |
| PQN-014 | Verify cable tray supports before cable pulling | Construction | Open | Focused assessment required | Monitoring |
From Trend to Assurance Action
Repeated QC Return → Proactive Quality Notification
Recurring / High-Risk Concern → Focused Assessment
Confirmed Nonconformance → NCR
Corrective Action → Effectiveness Verification → Closure → Lessons Learned